Fin-tube cladding system
The Fronius Fin-tube welding plant has been specially designed for primary or repair cladding on vaporiser walls in the heat exchanger industry or refuse incinerators.
The belt-driven trolley enables the connection of 2 torches including the oscillation unit and the manual adjustment and swivelling unit.
The motorised rail system allows a horizontal welding range of 10m and a vertical welding range of 4m (made-to-measure also possible). A highly sophisticated fall arresting device ensures the necessary safety on site.
Plant configuration:
- System-controller FCU-200 with remote control unit FRC-200
- Carriage (belt driven) with uptakes for 2 torches
- Mechanical fall-arrester for carriage
- Weld head with 2 oscillation units, mech. slides and swivel units for exact torch positioning
- Motorized horizontal rail for positioning of the vertical rail unit
- MIG-MAG power sources 400 A with cooling units
- Remote controls for power sources
- Wire feeders
- Robacta Drive machine torch/10 m
- Connection lines/hose packs
![]() |
Zoom
![]() |
Zoom

close


Technical data
| Max. welding length | 10 m |
| Horizontal weld range | 4 m (extendable) |
| Welding speed | 10 - 240 cm/min |
| Welding position | PF / PG |
en




